Washing Machine installation service

Service Guarantee
Instructions for removing transit bolts from an appliance:

1. Use a wrench to unscrew all transit bolts on the back of the appliance.
2. Remove the transit screws and bolts (first the 3 long screws, then the 4 bolts). Keep all pieces in a safe place for future use if needed.
3. Seal the 7 bolt holes with the provided covers to prevent dust from entering.
Instructions for removing transit bolts from an appliance:

1. Use a wrench to unscrew all transit bolts on the back of the appliance.
2. Remove the transit screws and bolts (first the 3 long screws, then the 4 bolts). Keep all pieces in a safe place for future use if needed.
3. Seal the 7 bolt holes with the provided covers to prevent dust from entering.
Instructions for removing transit bolts from an appliance:

1. Use a wrench to unscrew all transit bolts on the back of the appliance.
2. Remove the transit screws and bolts (first the 3 long screws, then the 4 bolts). Keep all pieces in a safe place for future use if needed.
3. Seal the 7 bolt holes with the provided covers to prevent dust from entering.
Instructions for removing transit bolts from an appliance:

1. Use a wrench to unscrew all transit bolts on the back of the appliance.
2. Remove the transit screws and bolts (first the 3 long screws, then the 4 bolts). Keep all pieces in a safe place for future use if needed.
3. Seal the 7 bolt holes with the provided covers to prevent dust from entering.
Xiaomi's installation service guarantee includes three main features: professional service, transparent pricing, and convenient booking. The professional service is carried out by officially authorized service providers to ensure the quality of on-site installation; transparent pricing avoids hidden fees; and convenient booking allows customers to choose the installation service, after which the service provider will contact the customer to arrange for the installation at their premises.
Standard Installation Service Content includes:

1. **Product Installation and User Guide**: Installation of new products and guidance for customers on basic functions.

2. **Installation Warranty Period**: Warranty valid for 90 days from installation completion, covering defects in the installation.
Standard Installation Service Process:

1. Purchasing the products.
2. An appointment for the delivery and installation service shall be made with you.
3. Delivery and installation service will be carried out on the same day.
4. Checked and accepted the installation.
5. Delivery and installation service completed.
Additional charges for on-site materials include:

- Installation of the Unit: RM 100
- Disposal and dismantling of old unit: RM 120
- Connector: RM 26
- Inlet Hose (1.5m): RM 20
- Inlet Hose (3.0m): RM 30
- Inlet Hose (5.0m): RM 45
- Drain Pipe (1.5m): RM 20
- Drain Pipe (2.0m): RM 25
Additional charges for on-site materials include:

- Installation of the Unit: RM 100
- Disposal and dismantling of old unit: RM 120
- Connector: RM 26
- Inlet Hose (1.5m): RM 20
- Inlet Hose (3.0m): RM 30
- Inlet Hose (5.0m): RM 45
- Drain Pipe (1.5m): RM 20
- Drain Pipe (2.0m): RM 25
Additional charges for on-site materials include:

- Installation of the Unit: RM 100
- Disposal and dismantling of old unit: RM 120
- Connector: RM 26
- Inlet Hose (1.5m): RM 20
- Inlet Hose (3.0m): RM 30
- Inlet Hose (5.0m): RM 45
- Drain Pipe (1.5m): RM 20
- Drain Pipe (2.0m): RM 25