1. Install the high torque brush bar
Hold the high torque brush bar, insert the extension rod vertically into the high torque brush bar until you hear a click;
2. Install the extension rod
Align the conductive needle of the metal connecting rod with the nozzle interface, and push it up firmly until you hear a "click" lock sound;
3. Install the 2-in-1 charging & storage mount
(1). The 2-in-1 charging & storage mount should be installed in a cool, dry place with an electrical outlet nearby. Before installing, ensure that there are not any wires or pipes in the space directly behind where the mount will be installed;
(2). The bottom of the mounting template sticker should be level and at least 1.03m from the ground, and its top should have at least 30cm of clearance above it;
(3). Use a power drill with an 8mm drill bit to drill a hole into each hole marker on the mounting template sticker, then insert a wall plug into each hole;
(4). Align the mounting holes on the 2-in-1 charging & storage mount to the holes on the wall, then attach the mount to the wall using the included screws.